Paid a visit to the house in Muar yesterday . The electricity meter of the house needs to be fixed as the readings on the meter could not be read anymore so the TNB man was waiting for us to arrive at the house to fix the meter . That was done, thank gawd .
The house is about 90% ready except for Kitchen , Grills and CC TVs. I also need to do the landscaping for the garden .


The kitchen is not done but will be a simple, open shelves kitchen with an oven , 2 hobs and a washing machine with a sink.




Went with my contractor to look at the finishing touches of the house . I need to get a wired CC TV outside the house & in the living room . I have contacted the CC TV company for this . The doors of the house are Nyatoh wood .
Leave a comment